• The PI System for Wind Farm Operational Intelligence & Management

    Mainstream RP generates over 330 MW of power in 4 continents. In 2012, the PI System was installed in the first wind farm.This presentation outlines:The central role the PI System plays in a day-to-day wind farm operations management, Business Intelligence ...
    Year: 2015

    Deploying a Condition-Based Maintenance Strategy in the Hydro Power Business

    Vattenfall Hydro Power needed to implement a new strategy for condition-based maintenance and asset management, leading to reduced costs for unplanned maintenance and increased accuracy in asset management risk analysis. The existing IT solution did not provide the necessary functionality ...
    Year: 2015

    CEPS (Czech Transmission System Operator) Challenges and Planned Solutions

    Ensuring reliable transmission of electricity is one of the key challenges at CEPS as a TSO (Transmission System Operator). As part of CEPS’ long-term strategy, PMU technology (Phasor Measurement Unit) was implemented across the most important parts of the extra ...
    Year: 2015

    Insights Using the PI System in Israel Electric's Electricity Chain

    The Israel Electric Corporation (IEC) was established in 1923 and is the sole integrated utility in Israel, being one of the largest industrial companies in the country. IEC generates, transmits and distributes practically all the electricity in Israel, with an ...
    Year: 2015

    Data Visualization for the Liander Grid Control Center

    Liander's strategy in a changing energy playing field is to focus on better customer service, operational excellence and move towards being a data-drive grid operator in the upcoming years. This presentation gives insight in Liander's journey to become a data-driven ...
    Year: 2015