• Driving long-term competitive advantage at North American Construction Group (NACG)

    Operating one of the largest fleets in North America, NACG wanted to shift to predictive maintenance to lower costs and increase availability, creating an even more compelling business case for their leasing clients. Having tried several other systems, they found ...
    Year: 2021

    The digital transformation of Jirau Hydropower plant operation through PI System deployment

    Jirau Energia and UNIFEI (through Jirau's R&D Program regulated by ANEEL - the Brazilian power market regulator) are currently working on an R&D project to optimize the power plant operation. The PI System is the center of the solution in development, ...
    Year: 2021

    Scientific tools for advanced synchrophasor data analytics with the PI System at PNNL

    After electric utilities use synchrophasor measurements for real-time monitoring they are archived in databases such as the PI System. The full potential of these years-long archives is yet to be realized due to obstacles such as bad data, inflexible analysis ...
    Year: 2021

    Engineering Portfolio Overview

    Leveraging a common platform and interactive 3D visualization, our engineering help you to be prepared for a more efficient, sustainable future. Attend this session to learn how our end-to-end engineering, execution and simulation solutions enable complete data integration between tools ...
    Year: 2021

    AVEVA Engineering & Design

    AVEVA’s Engineering & Design suite of solutions seamlessly integrates 1D, 2D, and 3D engineering information into a single environment to help our customers reduce rework and engineering errors, while laying the foundation for the Digital Twin starting as early as ...
    Year: 2021