Jiangxi Copper presents a PI-based control optimization system built for a copper smelter with annual output of 300,000 tons.
Year: 2007
Shang Du power plant use real-time data from PI infrastructure to construct computer models of boilers. The output data from the boiler models are then used to optimize the operation of real boilers. In comparison trial, the boiler models have ...
Year: 2007
Formosa Plastics Corporation presents RTPMS system built with PI infrastructure. RTPMS system has greatly improved the productivity and achieved monthly saving of $600,000 in initial deployment.
Year: 2007
Ales Soudek presents the business value of PI infrastructure to utilities companies. Iberdrola's Fossil and Wind Centralized Performance Centers and DTE Enterprise Infrastructure have leveraged PI infrastructure to create significant business value.
Year: 2007
Michael Chang from Microsoft presents software solution for manufacturing industry.
Year: 2007